Public domain
KSC-05pd-1331
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
Kennedy Space Center, Fla. — The Rotating Service Structure at Launch Pad 39B is ready to enfold Space Shuttle Discovery upon its arrival. First motion for the 4.2-mile journey was at 1:58 a.m. EDT. The Space Shuttle rests on a Mobile Launcher Platform that sits atop a Crawler-Transporter. This is the second rollout of Discovery. The orbiter was returned to the Vehicle Assembly Building for connection to an improved External Tank.
NASA Image and Video Library’s own descriptionCredit lineKSC-05pd-1331. NASA/KSC, 2005-06-15. Public domain. ID: 05pd1331.