Public domain
DSC_1145
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
Following a successful Green Run hot fire at NASA’s Stennis Space Center near Bay St. Louis, Mississippi, on March 18, members of a blended team work April 19-20 to remove the first core stage of the agency’s Space Launch System (SLS) rocket from the B-2 Test Stand. The work required crews to lift the core stage from its vertical placement in the stand and lower it to a horizontal position on the B-2 Test Stand tarmac.
NASA Image and Video Library’s own descriptionSubjects
Credit lineDSC_1145. NASA/SSC, 2021-04-19. Public domain. ID: DSC_1145.