Public domain
KSC-00pp1120
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
KENNEDY SPACE CENTER, Fla. -- Space Shuttle Atlantis, atop the Mobile Launcher Platform and Crawler-Transporter, arrives at Launch Pad 39B for preparations before launch. It started its 8-hour rollout from the Vehicle Assembly Building high bay 2 (Safe Haven) at 11:20 p.m., Aug. 13. This photo was taken about 7:15 a.m. At left is the Rotating Service Structure in its open position. Towering above the RSS (and attached to the Fixed Service Structure) is the 80-foot tall lightning mast.
NASA Image and Video Library’s own descriptionCredit lineKSC-00pp1120. NASA/KSC, 2000-08-14. Public domain. ID: KSC-00pp1120.