Public domain
KSC-00pp1482
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
Kennedy Space Center, Fla. — The open doors of Space Shuttle Discovery’s payload bay show the two elements to be added to the International Space Station on mission STS-92. At top is the third Pressurized Mating Adapter; below it is Integrated Truss Structure Z-1, the cornerstone truss of the Station. Making the 100th Space Shuttle mission launched from Kennedy Space Center, Discovery also will be making its 28th flight into space.
NASA Image and Video Library’s own descriptionCredit lineKSC-00pp1482. NASA/KSC, 2000-10-02. Public domain. ID: KSC-00pp1482.