Arkivism
KSC-00pp1491
Public domain

KSC-00pp1491

NASA / KSC · 2000-10-02 · photograph (digital archive)

From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.

About this work

Kennedy Space Center, Fla. — In the Operations and Checkout Building, the Joint Airlock Module is placed in a horizontal position to be transferred to the payload canister behind it. Then it will be moved to the Space Station Processing Facility where it will continue to undergo preflight processing for the STS-104 mission scheduled for launch aboard Space Shuttle Atlantis May 17, 2001.

NASA Image and Video Library’s own description
Credit lineKSC-00pp1491. NASA/KSC, 2000-10-02. Public domain. ID: KSC-00pp1491.

Similar works