Public domain
KSC-00pp1776
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
After rollback of the Rotating Service Structure (at left), Space Shuttle Endeavour stands ready for launch targeted for 10:06 p.m. EST tonight on mission STS-97 to the International Space Station. The orbiter carries the P6 Integrated Truss Segment containing solar arrays that will be temporarily installed to the Unity connecting module by the Z1 truss, recently delivered to and installed on the Station on mission STS-92. The two solar arrays are each more than 100 feet long.
NASA Image and Video Library’s own descriptionCredit lineKSC-00pp1776. NASA/KSC, 2000-11-30. Public domain. ID: KSC-00pp1776.