Public domain
KSC-01pp1360
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
KENNEDY SPACE CENTER, Fla. -- At the KSC Shuttle Landing Facility, near the Mate/Demate Device (backgound), the P5 truss is rolled out from the Super Guppy aircraft that delivered it. The truss will be transported to the Space Station Processing Facility. The P5 is scheduled for delivery to the International Space Station on mission 12A.1 in April 2003.
NASA Image and Video Library’s own descriptionCredit lineKSC-01pp1360. NASA/KSC, 2001-07-19. Public domain. ID: KSC-01pp1360.