Arkivism
KSC-03pd0233
Public domain

KSC-03pd0233

NASA / KSC · 2003-01-31 · photograph (digital archive)

From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.

About this work

Kennedy Space Center, Fla. — Suspended by an overhead crane in the Payload Hazardous Servicing Facility, the Mars Exploration Rover (MER) aeroshell is guided by workers as it moves to a rotation stand. Set to launch in 2003, the MER Mission will consist of two identical rovers designed to cover roughly 110 yards (100 meters) each Martian day.

NASA Image and Video Library’s own description
Credit lineKSC-03pd0233. NASA/KSC, 2003-01-31. Public domain. ID: KSC-03pd0233.

Similar works

Closed AeroshellClosed Aeroshell KENNEDY SPACE CENTER, FLA. -  In the Payload Hazardous Servicing Facility, workers prepare to mate the Mars Exploration Rover-2 (MER-2) to the third stage of a Delta II rocket for launch on June 5.  NASA’s twin Mars Exploration Rovers are designed to study the history of water on Mars. These roboticKENNEDY SPACE CENTER, FLA. - In the Payload Hazardous Servicing Facility, workers prepare to mate the Mars Exploration Rover-2 (MER-2) to the third stage of a Delta II rocket for launch on June 5. NASA’s twin Mars Exploration Rovers are designed to study the history of water on Mars. These robotic KENNEDY SPACE CENTER, FLA. - An overhead crane moves the Mars Exploration Rover 2 (MER-2) entry vehicle across the Payload Hazardous Servicing Facility toward a spin table for a dry-spin test.  The MER Mission consists of two identical rovers designed to cover roughly 110 yards each Martian day overKENNEDY SPACE CENTER, FLA. - An overhead crane moves the Mars Exploration Rover 2 (MER-2) entry vehicle across the Payload Hazardous Servicing Facility toward a spin table for a dry-spin test. The MER Mission consists of two identical rovers designed to cover roughly 110 yards each Martian day over KENNEDY SPACE CENTER, FLA. - Workers in the Payload Hazardous Servicing Facility prepare Mars Exploration Rover 1 (MER-B) to be mated with the third stage of the Delta rocket that will launch it to Mars.  The second of twin rovers being sent to Mars, it is equipped with a robotic arm, a drilling tooKENNEDY SPACE CENTER, FLA. - Workers in the Payload Hazardous Servicing Facility prepare Mars Exploration Rover 1 (MER-B) to be mated with the third stage of the Delta rocket that will launch it to Mars. The second of twin rovers being sent to Mars, it is equipped with a robotic arm, a drilling too KENNEDY SPACE CENTER, FLA. -  In the Payload Hazardous Servicing Facility, workers prepare to mate the Mars Exploration Rover-2 (MER-2) to the third stage of a Delta II rocket for launch on June 5.  NASA’s twin Mars Exploration Rovers are designed to study the history of water on Mars. These roboticKENNEDY SPACE CENTER, FLA. - In the Payload Hazardous Servicing Facility, workers prepare to mate the Mars Exploration Rover-2 (MER-2) to the third stage of a Delta II rocket for launch on June 5. NASA’s twin Mars Exploration Rovers are designed to study the history of water on Mars. These robotic KENNEDY SPACE CENTER, FLA. - In the Payload Hazardous Servicing Facility, workers prepare to lift the Mars Exploration Rover-1 (MER-B) onto a spin table during preflight processing of the spacecraft.  The rover is scheduled to launch aboard a Delta II rocket on June 25.  NASA’s twin Mars ExplorationKENNEDY SPACE CENTER, FLA. - In the Payload Hazardous Servicing Facility, workers prepare to lift the Mars Exploration Rover-1 (MER-B) onto a spin table during preflight processing of the spacecraft. The rover is scheduled to launch aboard a Delta II rocket on June 25. NASA’s twin Mars Exploration