Public domain
KSC-06pd1632
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
Kennedy Space Center, Fla. — In the Space Station Processing Facility, an overhead crane is ready to lift the Port 3/4 truss segment and move it to a payload canister for installation in the orbiter Atlantis. The truss is slated for launch on mission STS-115 no earlier than Aug. 28. The truss is the next major addition to the 11-segment integrated truss structure that will eventually span more than 300 feet on the station.
NASA Image and Video Library’s own descriptionCredit lineKSC-06pd1632. NASA/KSC, 2006-07-21. Public domain. ID: KSC-06pd1632.