Public domain
KSC-06pd1916
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
Kennedy Space Center, Fla. — Workers on Launch Pad 39B watch closely as Space Shuttle Atlantis' payload bay doors begin to close. Inside the payload bay is the orbiter's cargo, the 17-and-a-half-ton P3/P4 truss segment for the International Space Station. Mission STS-115 is scheduled to lift off about 4:30 p.m. Aug. 27. The crew will deliver and install the P3/P4 segment to the port side of the integrated truss system on the International Space Station.
NASA Image and Video Library’s own descriptionCredit lineKSC-06pd1916. NASA/KSC, 2006-08-24. Public domain. ID: KSC-06pd1916.