Public domain
KSC-06pd2407
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
Kennedy Space Center, Fla. — In the Space Station Processing Facility, the P5 truss for mission STS-116 moves closer to the payload canister (left). The canister will transport the truss to Launch Pad 39B where it will wait for installation in Space Shuttle Discovery’s payload bay. The third port truss segment, the P5 will be attached to the P3/P4 truss on the International Space Station during the 11-day mission. The window for launch of mission STS-116 opens Dec. 7.
NASA Image and Video Library’s own descriptionCredit lineKSC-06pd2407. NASA/KSC, 2006-10-31. Public domain. ID: KSC-06pd2407.