Public domain
KSC-06pd2423
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
Kennedy Space Center, Fla. — The overhead crane and sling raise the orbiter Discovery to a vertical position in the transfer aisle of the Vehicle Assembly Building. The orbiter will be lifted up into high bay 3 and lowered onto the mobile launcher platform where the external tank and solid rocket boosters are already stacked. Space Shuttle Discovery is scheduled to roll out to Launch Pad 39B no earlier than Nov. 7 for mission STS-116. The mission is No.
NASA Image and Video Library’s own descriptionCredit lineKSC-06pd2423. NASA/KSC, 2006-11-01. Public domain. ID: KSC-06pd2423.