Public domain
KSC-06pd2440
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
Kennedy Space Center, Fla. — With its crane still attached, the orbiter Discovery is settled into place behind the external tank and solid rocket boosters on the mobile launcher platform in high bay 3 of the Vehicle Assembly Building. The orbiter will be mated to the stack in preparation for launch. Space Shuttle Discovery is scheduled to roll out to Launch Pad 39B no earlier than Nov. 7 for mission STS-116. The mission is No.
NASA Image and Video Library’s own descriptionCredit lineKSC-06pd2440. NASA/KSC, 2006-11-01. Public domain. ID: KSC-06pd2440.