Arkivism
KSC-06pd2487
Public domain

KSC-06pd2487

NASA / KSC · 2006-11-09 · photograph (digital archive)

From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.

About this work

Kennedy Space Center, Fla. — The crawler-transporter moves away from Launch Pad 39B after depositing its cargo, Space Shuttle Discovery and the mobile launcher platform. The shuttle's external tank is capped by the oxygen vent hood. Farther to the left above the fixed service structure is the 80-foot tall lightning mast. The rollout from the Vehicle Assembly Building began at 12:29 a.m. The shuttle was harddown on the pad at 9:03 a.m. The mission is No.

NASA Image and Video Library’s own description
Credit lineKSC-06pd2487. NASA/KSC, 2006-11-09. Public domain. ID: KSC-06pd2487.

Similar works