Public domain
KSC-07pd0320
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
Kennedy Space Center, Fla. — In the transfer aisle of the Vehicle Assembly Building, the overhead sling lifts the orbiter Atlantis off the transporter. The orbiter will be raised to vertical and lifted up into high bay 1. Then it will be lowered onto the mobile launcher platform where the external tank and solid rocket boosters are already stacked. Space Shuttle Atlantis is targeted to roll out to Launch Pad 39A on February 14 for mission STS-117. The mission is No.
NASA Image and Video Library’s own descriptionSubjects
Credit lineKSC-07pd0320. NASA/KSC, 2007-02-07. Public domain. ID: KSC-07pd0320.