Arkivism
KSC-07pd0380
Public domain

KSC-07pd0380

NASA / KSC · 2007-02-15 · photograph (digital archive)

From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.

About this work

Kennedy Space Center, Fla. — Majestic in its formation, Space Shuttle Atlantis begins moving through the open door of the Vehicle Assembly Building for the rollout to Launch Pad 39A. First motion was at 8:19 a.m. The 3.4-mile trip along the crawlerway will take about 6 hours. The mission payload aboard Space Shuttle Atlantis is the S3/S4 integrated truss structure, along with a third set of solar arrays and batteries.

NASA Image and Video Library’s own description
Subjects
OV-104, 13A
Credit lineKSC-07pd0380. NASA/KSC, 2007-02-15. Public domain. ID: KSC-07pd0380.

Similar works