Public domain
KSC-07pd0391
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
Kennedy Space Center, Fla. — Atop the massive mobile launcher platform and crawler-transporter, Space Shuttle Atlantis looms above a flock of pelicans perched on the retaining wall below. The shuttle is rolling out to Launch Pad 39A. First motion out of the Vehicle Assembly Building was at 8:19 a.m. The 3.4-mile trip to the pad along the crawlerway will take about 6 hours.
NASA Image and Video Library’s own descriptionSubjects
Credit lineKSC-07pd0391. NASA/KSC, 2007-02-15. Public domain. ID: KSC-07pd0391.