Public domain
KSC-07pd0401
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
Kennedy Space Center, Fla. — Lined up on the horizon are Space Shuttle Atlantis, the rotating and fixed service structures of Launch Pad 39A, Launch Pad 39B, and the 300-gallon water tower of Pad 39A. The shuttle has spent six hours rolling out to Pad 39A, leaving the Vehicle Assembly Building at 8:19 a.m. The body of water in the foreground is the Banana River.
NASA Image and Video Library’s own descriptionSubjects
Credit lineKSC-07pd0401. NASA/KSC, 2007-02-15. Public domain. ID: KSC-07pd0401.