Public domain
KSC-08pd2519
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kennedy Space Center, external fuel tank 129 is lifted out of the checkout cell to high bay 1 where it will be mated with the solid rocket boosters. The external tank-SRB stack will be mated in two weeks to space shuttle Endeavour for the STS-126 mission. The STS-126 mission will deliver a Multi-Purpose Logistics Module to the International Space Station. Launch is targeted for Nov. 10.
NASA Image and Video Library’s own descriptionCredit lineKSC-08pd2519. NASA/KSC, 2008-08-28. Public domain. ID: KSC-08pd2519.