Public domain
KSC-2009-3160
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, an overhead crane lifts the Integrated Cargo Carrier-VLD (Vertical Light Deployment), part of the payload for the STS-127 mission. The ICC-VLD is being transferred to the payload canister, seen at right. The canister will deliver the ICC-VLD and other elements to Launch Pad 39A for installation in space shuttle Endeavour's payload bay. Launch is targeted for June 13.
NASA Image and Video Library’s own descriptionSubjects
Credit lineKSC-2009-3160. NASA/KSC, 2009-05-15. Public domain. ID: KSC-2009-3160.