Public domain
KSC-2009-5443
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, a crawler-transport safely delivers space shuttle Atlantis into position beside the fixed service structure on Launch Pad 39A. First motion on the 3.4-mile journey from the Vehicle Assembly Building, known as rollout, was at 6:38 a.m. EDT Oct. 14. The rollout took about six hours, and the shuttle was secure on the pad at 1:31 p.m.
NASA Image and Video Library’s own descriptionSubjects
Credit lineKSC-2009-5443. NASA/KSC, 2009-10-14. Public domain. ID: KSC-2009-5443.