Public domain
Crawler Lifts Mobile Launcher
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
Preparations are underway May 31, 2018, to move crawler-transporter 2 (CT-2) under the mobile launcher at NASA's Kennedy Space Center in Florida. Three lifts will be performed to practice lifting procedures, validate interface locations, confirm the weight of the mobile launcher, and develop a baseline for modal analysis. The mobile launcher is equipped with a number of lines, called umbilicals, which will connect to NASA's Space Launch System (SLS) and Orion.
NASA Image and Video Library’s own descriptionSubjects
Credit lineCrawler Lifts Mobile Launcher. NASA/KSC, 2018-05-31. Public domain. ID: KSC-20180531-PH_KLS01_0002.