Public domain
LH2/TSMU Lift and Install
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
The second of two Tail Service Mast Umbilicals is lifted by crane for installation on the 0-level deck of the mobile launcher on July 27, at NASA's Kennedy Space Center in Florida. The 35-foot-tall umbilical will connect to NASA's Space Launch System (SLS) rocket core stage aft section and provide liquid hydrogen and electrical cable connections to the core stage engine section to support propellant handling during prelaunch operations.
NASA Image and Video Library’s own descriptionSubjects
Credit lineLH2/TSMU Lift and Install. NASA/KSC, 2018-07-27. Public domain. ID: KSC-20180727-PH_CSH01_0054.