Public domain
Countdown Demonstration & Cryogenic Loading
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
Engineers with Exploration Ground Systems monitor their consoles during a countdown demonstration event of cryogenic propellant loading April 12, 2019, inside Firing Room 2 in the Launch Control Center at NASA’s Kennedy Space Center in Florida. The practice simulation involved loading of liquid hydrogen and liquid oxygen into the Space Launch System rocket’s core and upper stages to prepare for Exploration Mission-1 (EM-1).
NASA Image and Video Library’s own descriptionSubjects
Credit lineCountdown Demonstration & Cryogenic Loading. NASA/KSC, 2019-04-12. Public domain. ID: KSC-20190412-PH_CSH01_0011.