Arkivism
Countdown Demonstration & Cryogenic Loading
Public domain

Countdown Demonstration & Cryogenic Loading

NASA / KSC · 2019-04-12 · photograph (digital archive)

From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.

About this work

Engineers with NASA and contractor Jacobs monitor their consoles during a countdown demonstration event of cryogenic propellant loading April 12, 2019, inside Firing Room 2 in the Launch Control Center at NASA’s Kennedy Space Center in Florida. The practice simulation involved loading of liquid hydrogen and liquid oxygen into the Space Launch System rocket’s core and upper stages to prepare for Exploration Mission-1 (EM-1).

NASA Image and Video Library’s own description
Credit lineCountdown Demonstration & Cryogenic Loading. NASA/KSC, 2019-04-12. Public domain. ID: KSC-20190412-PH_CSH01_0105.

Similar works