Public domain
Core Pathfinder & Spider Mate
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, NASA and Jacobs TOSC workers monitor the progress as a cover, called the spider, is attached to the top of the Space Launch System (SLS) Core Stage pathfinder on Oct. 4, 2019. With the spider secured in place, a crane will be attached to it to lift the pathfinder into the vertical position. The 212-foot-long core stage pathfinder arrived on NASA's Pegasus Barge at Kennedy’s Launch Complex 39 turn basin wharf on Sept.
NASA Image and Video Library’s own descriptionSubjects
Credit lineCore Pathfinder & Spider Mate. NASA/KSC, 2019-10-04. Public domain. ID: KSC-20191004-PH-KLS01_0020.