Arkivism
Core Stage Pathfinder Training Month - Lift into High Bay 3
Public domain

Core Stage Pathfinder Training Month - Lift into High Bay 3

NASA / KSC · 2019-10-15 · photograph (digital archive)

From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.

About this work

Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, the Space Launch System (SLS) Core Stage pathfinder is lifted into the vertical position in the transfer aisle on Oct. 15, 2019. In the foreground is a portion of a pathfinder booster. The 212-foot-long core stage pathfinder arrived on NASA's Pegasus Barge at Kennedy’s Launch Complex 39 turn basin wharf on Sept. 27, 2019.

NASA Image and Video Library’s own description
Credit lineCore Stage Pathfinder Training Month - Lift into High Bay 3. NASA/KSC, 2019-10-15. Public domain. ID: KSC-20191015-PH-JBS02_0003.

Similar works