Public domain
Core Stage Pathfinder Training Month - Lift into High Bay 3
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
In this close-up view inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a crane and special cover, called a spider, attached to the top of the Space Launch System (SLS) Core Stage pathfinder, are used to lift the pathfinder into the vertical position in the transfer aisle on Oct. 15, 2019. The 212-foot-long core stage pathfinder arrived on NASA's Pegasus Barge at Kennedy’s Launch Complex 39 turn basin wharf on Sept. 27, 2019.
NASA Image and Video Library’s own descriptionSubjects
Credit lineCore Stage Pathfinder Training Month - Lift into High Bay 3. NASA/KSC, 2019-10-15. Public domain. ID: KSC-20191015-PH-JBS02_0054.