Public domain
Mars 2020 SRB 3 Preparations for Lift and Mate
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
A view from inside the Vertical Integration Facility (VIF) at Space Launch Complex 41 at Cape Canaveral Air Force Station in Florida, as the third of four solid rocket boosters (SRB) for the United Launch Alliance Atlas V 541 rocket is lifted up by crane on June 8, 2020. The SRB will be mated to the Atlas V booster inside the VIF. NASA’s Mars 2020 mission with the Perseverance rover is scheduled to launch on July 20, 2020, atop the Atlas V rocket from Pad 41.
NASA Image and Video Library’s own descriptionSubjects
Credit lineMars 2020 SRB 3 Preparations for Lift and Mate. NASA/KSC, 2020-06-08. Public domain. ID: KSC-20200608-PH-JBS01_0114.