Arkivism
Mars 2020 SRB #4 Preparations for Lift and Mate
Public domain

Mars 2020 SRB #4 Preparations for Lift and Mate

NASA / KSC · 2020-06-09 · photograph (digital archive)

From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.

About this work

The fourth and final solid rocket booster (SRB) for the United Launch Alliance Atlas V 541 rocket arrives at the Vertical Integration Facility (VIF) at Space Launch Complex 41 at Cape Canaveral Air Force Station (CCAFS) in Florida on June 9, 2020. The SRB will be prepared for lift and mating to the Atlas V booster in the VIF. The Mars 2020 mission with the Perseverance rover is scheduled to launch in July 2020, atop the Atlas V rocket from Pad 41.

NASA Image and Video Library’s own description
Credit lineMars 2020 SRB #4 Preparations for Lift and Mate. NASA/KSC, 2020-06-09. Public domain. ID: KSC-20200609-PH-GEB01_0008.

Similar works