Public domain
Mars 2020 SRB #4 Preparations for Lift and Mate
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
Inside the Vertical Integration Facility (VIF) at Space Launch Complex 41 at Cape Canaveral Air Force Station (CCAFS) in Florida, United Launch Alliance (ULA) workers watch as the fourth and final solid rocket booster (SRB) for the United Launch Alliance Atlas V 541 rocket is lowered by crane on June 9, 2020. The SRB will be mated to the Atlas V booster. NASA’s Mars 2020 mission with the Perseverance rover is scheduled to launch in July 2020, atop the Atlas V rocket from Pad 41.
NASA Image and Video Library’s own descriptionSubjects
Credit lineMars 2020 SRB #4 Preparations for Lift and Mate. NASA/KSC, 2020-06-09. Public domain. ID: KSC-20200609-PH-GEB01_0175.