Public domain
Artemis I 11th Terminal Count Simulation
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
From left, Beverly Case, handling, mechanics & structures engineer for contractor Jacobs, and David Valletta, NASA ignition overpressure protection and sound suppression engineer, participate in the 11th terminal countdown simulation for the Artemis I launch inside Kennedy Space Center’s Launch Control Center on Oct. 14, 2021. The event marked the first time members of NASA’s mission management team, launch team, and Jacobs conducted the simulation together.
NASA Image and Video Library’s own descriptionCredit lineArtemis I 11th Terminal Count Simulation. NASA/KSC, 2021-10-14. Public domain. ID: KSC-20211014-PH-KLS01_0115.