Arkivism
Artemis I WDR Rollout #2 - ML Elevator Shot
Public domain

Artemis I WDR Rollout #2 - ML Elevator Shot

NASA / KSC · 2022-06-03 · photograph (digital archive)

From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.

About this work

The crawler-transporter, driven by engineers, has moved underneath the Artemis I Space Launch System with the Orion spacecraft atop on the mobile launcher inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on June 3, 2022. The crawler will carry the Artemis I stack to Launch Complex 39B for a wet dress rehearsal test ahead of the Artemis I launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft.

NASA Image and Video Library’s own description
Credit lineArtemis I WDR Rollout #2 - ML Elevator Shot. NASA/KSC, 2022-06-03. Public domain. ID: KSC-20220603-PH-FMX01_0016.

Similar works