Sam Dove, crawler-transporter operations engineer and driver, Jacobs Engineering, is seen inside the operator cab of the crawler-transporter during rollout operations for NASA’s Space Launch System and Orion spacecraft at the agency’s Kennedy Space Center in Florida on Tuesday, Aug. 16, 2022. The crawler-transporter is under the Artemis I stack atop the mobile launcher and will carry it 4.2 miles via the crawlerway that connects the VAB to the launch pad.