Arkivism
Artemis I Post-Launch Mobile Launcher Rollback
Public domain

Artemis I Post-Launch Mobile Launcher Rollback

NASA / KSC · 2022-12-09 · photograph (digital archive)

From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.

About this work

NASA’s mobile launcher, carried atop the crawler-transporter 2, is moved inside High Bay 3 of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on Dec. 9, 2022, following the successful launch of the agency’s Space Launch System (SLS) rocket and Orion spacecraft on the Artemis I flight test on Nov. 16, 2022. The mobile launcher will remain inside the VAB for several weeks as teams get it ready for the Artemis II crewed mission.

NASA Image and Video Library’s own description
Credit lineArtemis I Post-Launch Mobile Launcher Rollback. NASA/KSC, 2022-12-09. Public domain. ID: KSC-20221209-PH-JBS01_0104.

Similar works