Public domain
Artemis II SM Move to Fast Cell
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
Engineers and technicians monitor the progress as the European Service Module (ESM) for NASA’s Artemis II mission is lifted by crane inside the high bay of the Neil A. Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on May 22, 2023. Teams from NASA and Lockheed Martin are preparing the service module for transfer to the FAST (final assembly and system testing) cell for final checkouts before it is stacked with the Orion crew module..
NASA Image and Video Library’s own descriptionCredit lineArtemis II SM Move to Fast Cell. NASA/KSC, 2023-05-22. Public domain. ID: KSC-20230522-PH-AMS01_0005.