Public domain
Molten Regolith Electrolysis Project Testing
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
Inside a laboratory in the Neil A. Armstrong Operations and Checking Building at NASA’s Kennedy Space Center in Florida, testing is underway with the Volatile Monitoring Oxygen Measurement Subsystem (VMOMS) for Molten Regolith Electrolysis (MRE) on April 19, 2024. The high-temperature electrolytic process aims to extract oxygen from simulated lunar regolith, which will be critical to the agency’s Artemis campaign.
NASA Image and Video Library’s own descriptionSubjects
Credit lineMolten Regolith Electrolysis Project Testing. NASA/KSC, 2024-04-19. Public domain. ID: KSC-20240419-PH-ILW01_0032.