Public domain
Artemis II Stacking - Booster Segment Prep for Lift Ops
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
Engineers and technicians with the Exploration Ground Systems Program attach an overhead crane to the left aft assembly, or bottom portion of the solid rocket boosters for the SLS (Space Launch System) rocket, inside the Vehicle Assembly Building at NASA’s Kennedy Space Center on Tuesday, Nov. 19, 2024. The crane will lift the aft assembly on top of mobile launcher 1 followed by the right aft assembly and stack the remaining booster segments for the Artemis II mission.
NASA Image and Video Library’s own descriptionCredit lineArtemis II Stacking - Booster Segment Prep for Lift Ops. NASA/KSC, 2024-11-19. Public domain. ID: KSC-20241119-PH-GEB01_0064.