Arkivism
Artemis III Core Stage Offload and Transport to VAB
Public domain

Artemis III Core Stage Offload and Transport to VAB

NASA / KSC · 2026-04-28 · photograph (digital archive)

From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.

About this work

NASA’s top four-fifths of the SLS (Space Launch System) core stage for the Artemis III mission is offloaded from the agency’s Pegasus barge on Tuesday, April 28, 2026, after arriving at the Kennedy Space Center in Florida the prior day. The four-fifths contains the liquid hydrogen tank, liquid oxygen tank, intertank, and forward skirt of the SLS rocket and will be joined with the remaining core stage segments at Kennedy’s Vehicle Assembly Building High Bay 2 prior to rocket stacking operations.

NASA Image and Video Library’s own description
Credit lineArtemis III Core Stage Offload and Transport to VAB. NASA/KSC, 2026-04-28. Public domain. ID: KSC-20260428-PH-GEB02_0003.

Similar works