Public domain
KSC-69P-0204
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
CAPE CANAVERAL, Fla. – Apollo command and service modules scheduled for manned landing missions on the moon cross paths in the Manned Spacecraft Operations Building at the spaceport. The meeting occurred last night when the CSM for Apollo 11 was being hoisted out of a test chamber and the CSM for Apollo 12, which recently arrived at Kennedy Space Center, was getting its initial checkouts in the aisle. Apollo 11 is scheduled for the first manned lunar landing mission this summer.
NASA Image and Video Library’s own descriptionCredit lineKSC-69P-0204. NASA/KSC, 1969-04-02. Public domain. ID: KSC-69P-0204.