Public domain
KSC-97pc381
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
Space Shuttle Columbia rolls over from Orbiter Processing Facility bay 1 to the Vehicle Assembly Building to be mated to its external tank/solid rocket booster stack. Roll out to Pad 39A in preparation for mission STS-83 is set for first motion at 7 a.m. on Tuesday. Launch is currently targeted for April 3 at 2:01 p.m.
NASA Image and Video Library’s own descriptionCredit lineKSC-97pc381. NASA/KSC, 1997-03-05. Public domain. ID: KSC-97pc381.