Public domain
KSC-98pc371
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
Kennedy Space Center, Fla. — The Space Shuttle orbiter Columbia was transferred from Orbiter Processing Facility Bay 3 today to the Vehicle Assembly Building, where it will be mated to its external tank and solid rocket boosters. Here it is shown backing out of the bay, with first motion occurring at 10:48 a.m. Columbia is being prepared for the STS-90 mission, carrying the Neurolab payload.
NASA Image and Video Library’s own descriptionCredit lineKSC-98pc371. NASA/KSC, 1998-03-16. Public domain. ID: KSC-98pc371.