Public domain
KSC-99pp0864
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
The rollback of the Rotating Service Structure on launch Pad 39-B reveals Space Shuttle Columbia on its mobile launcher platform, waiting for the launch of mission STS-93 on July 20 at 12:36 a.m. EDT. The primary payload of STS-93 is the Chandra X-ray Observatory, which will allow scientists from around the world to study some of the most distant, powerful and dynamic objects in the universe.
NASA Image and Video Library’s own descriptionCredit lineKSC-99pp0864. NASA/KSC, 1999-07-19. Public domain. ID: KSC-99pp0864.