Arkivism
KSC00pp0404
Public domain

KSC00pp0404

NASA / KSC · 2000-03-25 · photograph (digital archive)

From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.

About this work

Inside the Vehicle Assembly Building, Space Shuttle Atlantis stands ready for rollout to Launch Pad 39A. It sits on top of a Mobile Launcher Platform (MLP), a two-story steel structure 25 feet high, which supports and restrains the Shuttle during assembly, transit and while at the pad. The MLP weighs 8.23 million pounds. The entire configuration of Shuttle plus MLP is moved to the pad aboard a crawler-transporter. Liftoff of Atlantis on mission STS-101 is scheduled for April 17 at 7:03 p.m. EDT.

NASA Image and Video Library’s own description
Credit lineKSC00pp0404. NASA/KSC, 2000-03-25. Public domain. ID: KSC00pp0404.

Similar works