Public domain
KSC00pp1104
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
Kennedy Space Center, Fla. — An overhead crane lifts the Integrated Cargo Carrier (ICC), with equipment on top, toward the payload canister (right) where the SPACEHAB module is already stowed. The canister will transport its cargo to Launch Pad 39B in preparation for mission STS-106, scheduled to launch Sept. 8 at 8:31 a.m. EDT.
NASA Image and Video Library’s own descriptionCredit lineKSC00pp1104. NASA/KSC, 2000-08-13. Public domain. ID: KSC00pp1104.