Public domain
KSC00pp1202
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
Kennedy Space Center, Fla. — Workers watch as the orbiter Discovery rolls backward out of the Orbiter Processing Facility bay 3 for transfer to the Vehicle Assembly Building, where it will be mated with its external tank and solid rocket boosters. Discovery is scheduled to launch Oct. 5 at 9:30 p.m. EDT on mission STS-92, delivering two elements of the International Space Station: the Z-1 truss and Pressurized Mating Adapter-3.
NASA Image and Video Library’s own descriptionCredit lineKSC00pp1202. NASA/KSC, 2000-08-24. Public domain. ID: KSC00pp1202.