Public domain
KSC00pp1730
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
Kennedy Space Center, Fla. — On Launch Pad 39B, the payload transport canister waits at the base of the Rotating Service Structure (RSS) with the P6 integrated truss segment inside. The canister will be lifted up to the payload changeout room (PCR) where the P6 will be removed for transfer to Space Shuttle Endeavour’s payload bay.
NASA Image and Video Library’s own descriptionCredit lineKSC00pp1730. NASA/KSC, 2000-11-14. Public domain. ID: KSC00pp1730.