Public domain
Liquid Oxygen Tank Barrel for Core Stage Moves for Next Phase of Production
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
On Thursday, February 10, 2022, move crews at NASA’s Michoud Assembly Facility lift the core stage 3 liquid oxygen tank (LOX) aft barrel out of the vertical friction stir weld tool to be moved for its next phase of production. Eventually, the aft barrel will be mated with the forward barrel and forward and aft domes to create the LOX tank, which will be used for the Space Launch System’s Artemis III mission.
NASA Image and Video Library’s own descriptionCredit lineLiquid Oxygen Tank Barrel for Core Stage Moves for Next Phase of Production. NASA/MAF, 2022-02-10. Public domain. ID: MAF_20220210_CS3_LoxAftBarrel12.