Public domain
Artemis I Rollback Preparations
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
Crawler Transporter-2 (CT-2) is seen outside the gates at Launch Pad 39B as teams configure systems for rolling NASA’s Space Launch System (SLS) rocket and Orion spacecraft back to the Vehicle Assembly Building, Saturday, Sept. 24, 2022, at NASA’s Kennedy Space Center in Florida. NASA is foregoing a launch opportunity on Tues. Sept. 27 and continues to watch the weather forecast associated with Tropical Storm Ian.
NASA Image and Video Library’s own descriptionSubjects
Credit lineArtemis I Rollback Preparations. NASA/HQ, 2022-09-24. Public domain. ID: NHQ202209240004.