Arkivism
Different Looks for Titan Lakes
Public domain

Different Looks for Titan Lakes

NASA / JPL · 2013-01-08 · photograph (digital archive)

From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.

About this work

Lakes on Saturn moon Titan reflect radio waves in varying ways in this image from NASA Cassini spacecraft. If a lake is fully liquid, it looks dark, but if it is only partially liquid, it looks brighter.

NASA Image and Video Library’s own description
Credit lineDifferent Looks for Titan Lakes. NASA/JPL, 2013-01-08. Public domain. ID: PIA16635.

Similar works